預(yù)裂爆破切頂卸壓技術(shù)及切頂參數(shù)合理選取研究
中圖分類(lèi)號(hào):TD322 文獻(xiàn)標(biāo)志碼:A 文章編號(hào):1003-5168(2025)07-0034-05
DOI:10.19968/j.cnki.hnkj.1003-5168.2025.07.007
Top Cutting and Pressure Relief Technology of Pre-fracturing Blasting and Reasonable Selection of Top Cutting Parameters
HE Haoda'LOU Peijie12 (1.School of Civil Engineeringand Construction,Anhui Universityof Technology,Huainan 232Oo1,China; 2.State KeyLaboratory for Fine Exploration and Intelligent Development of Coal Resources, China University of Mining and Technology,Xuzhou 221116,China)
Abstract:[Purposes] This study aims to address the issue of the 131105 working face mining affecting the use of the central roadway in a coal mine,by using pre-fracturing blasting technology to cut off the stress from the mined area and transfer it to the mined area sideways,thus ensuring the normal use of the central roadway.The optimal parameters for cuting-top relief are proposed to achieve the best relief effect.[Methods] This study analyzes the cuting-top relief mechanismand derives the basic scheme for cutting-top relief through theoretical analysis and engineering analogy.The analysis is conducted using the FLAC3D software at different heights and angles to obtain the optimal cutting-top height and angle,
thereby verifying the rationality of the basic scheme.[Findings] The study shows that the cutting-top angle should not be too large nor too small,with the optimal angle being .As the cutting-top height increases,the degree of stress concentration on the side of the mined area gradually decreases.When the cutting-top height exceeds 2 5 m ,the degree of stress concentration changes litle. Ultimately,a cuttingtop height of 2 5 m is chosen.[Conclusions] By pre-fracturing blasting on the side of the working face and selecting reasonable cutting-top parameters,it is possble to effectively cut off the stress transfer from the hard roof and reduce the peak support pressure, thereby achieving the goal of protecting the side roadway,which providesreferenceand guidance forsimilarmines.
Keywords:mining influence; pre-fracturing blasting; cuting top and relieving pressure; FLAC ; numerical simulation
0 引言
隨著我國(guó)煤礦開(kāi)采強(qiáng)度和深度的增加,地應(yīng)力、采動(dòng)應(yīng)力影響范圍、應(yīng)力集中系數(shù)逐漸增大,加之巷道圍巖力學(xué)性質(zhì)的惡化,巷道變形愈發(fā)劇烈[]。(剩余4891字)
- 新物質(zhì)形態(tài)“時(shí)間準(zhǔn)晶體”面世...
- 科學(xué)家觀察到DNA開(kāi)始解旋瞬間...
- 聲子極化激元電激發(fā)首次實(shí)現(xiàn)...
- 新型光電子芯片能效和帶寬創(chuàng)紀(jì)錄...
- 二硒化鈮薄膜中發(fā)現(xiàn)隱形超導(dǎo)態(tài)...
- 新器件實(shí)現(xiàn)“藍(lán)色能源”高效轉(zhuǎn)換...
- 智能熱網(wǎng)系統(tǒng)在某智慧電廠中的應(yīng)...
- 一種金融系統(tǒng)的混沌機(jī)理分析及有...
- 民航通信導(dǎo)航監(jiān)視系統(tǒng)可靠性提升...
- 夾套弧板結(jié)構(gòu)設(shè)計(jì)及Creo有限...
- 一種新型棒狀物料卸盤(pán)裝置的設(shè)計(jì)...
- 同軸直旋混合射流噴嘴結(jié)構(gòu)參數(shù)優(yōu)...
- 預(yù)裂爆破切頂卸壓技術(shù)及切頂參數(shù)...
- 考慮庫(kù)水位波動(dòng)和暴雨影響的滑坡...
- 江西桃源金礦1:1萬(wàn)土壤剖面采...
- 基于HEC-HMS模型的小流域...
- 城鄉(xiāng)供水一體化的現(xiàn)狀探討與熱點(diǎn)...
- 正棱柱斜拉索風(fēng)雨激振模型減振效...
- 復(fù)合型鐵路瓦斯隧道通風(fēng)流場(chǎng)及瓦...
- 2 0 0 m 級(jí)預(yù)應(yīng)力混凝土...
- 基于綠色溶劑的鈣鈦礦薄膜一步法...
- 固體廢棄物無(wú)害化處理技術(shù)的創(chuàng)新...
- 高爐煤氣流分布及組分預(yù)測(cè)研究...
- 縣域農(nóng)業(yè)-城鎮(zhèn)-生態(tài)空間整治潛...
- 基于PLUS與InVEST模型...
- 江西省2000—2018年森林...
- 西部典型寒旱區(qū)某鐵礦排土場(chǎng)生態(tài)...
- 定邊油田羅龐塬地區(qū)長(zhǎng)7段頁(yè)巖油...
- 跨境數(shù)字知識(shí)產(chǎn)權(quán)爭(zhēng)議在線調(diào)解機(jī)...
- 人工智能生成內(nèi)容的著作權(quán)法保護(hù)...
- 知識(shí)產(chǎn)權(quán)助力河南省主導(dǎo)產(chǎn)業(yè)創(chuàng)新...
- 艾拉司群的專(zhuān)利技術(shù)分析...
- 長(zhǎng)江經(jīng)濟(jì)帶數(shù)字技術(shù)創(chuàng)新水平測(cè)度...
- 數(shù)字化轉(zhuǎn)型下河南省智慧農(nóng)業(yè)發(fā)展...
- 河南省智慧文旅產(chǎn)業(yè)現(xiàn)狀及高質(zhì)量...