尾礦庫大調(diào)洪庫容下的水量平衡計(jì)算
〔摘 要〕按我國(guó)現(xiàn)行規(guī)范要求,尾礦庫調(diào)洪演算應(yīng)采用水量平衡法計(jì)算,且一次洪水排出時(shí)間應(yīng)小于72 h。但當(dāng)尾礦庫調(diào)洪庫容可裝下一次洪水總量時(shí),則多出現(xiàn)計(jì)算結(jié)果不能滿足規(guī)范要求的情況。通過案例分析,提出可通過擬定更高水頭的條件下得出滿足規(guī)范要求的洪水位,并依此確定符合尾礦庫防洪安全要求的防洪高度。
〔關(guān)鍵詞〕尾礦庫;調(diào)洪演算;水量平衡法;防洪高度;調(diào)洪庫容
中圖分類號(hào):TD926.4;TV122 文獻(xiàn)標(biāo)志碼:A 文章編號(hào):1004-4345(2025)01-0038-04
Calculation of Water Balance under Large Storage Capacity of Tailings Storage for Flood Control
LIU Hanhe
(China Nerin Engineering Co., Ltd., Nanchang, Jiangxi 330038, China)
Abstract According to the current codes in China, the method of water balance is used to calculate the flood control of tailings storage, and the flood discharge time should be less than 72 hours. However, when the flood control capacity of the tailings storage can accommodate the total amount of the flood, it often occurs that the calculation results cannot satisfy the requirement of the codes. Through case analysis, it is proposed that the flood level that meets the codes requirements can be derived by formulating higher water head, and accordingly, the required flood control height can be finally determined to ensure the safety of tailings storage flood control.
Keywords tailings storage; flood control calculation; water balance method; flood control height; storage capacity for flood control
尾礦庫是用于貯存金屬、非金屬礦山進(jìn)行礦石選別后排出尾礦的場(chǎng)所,是礦山重要的安全設(shè)施,同時(shí)也是重大危險(xiǎn)源。(剩余3645字)
-
-
- 有色冶金設(shè)計(jì)與研究
- 2025年01期
- 基于三維模型的基建探礦設(shè)計(jì)實(shí)例...
- 破碎巖層皮帶道馬頭門與計(jì)量硐室...
- 電解錳渣資源化及高值化利用研究...
- 廢電路板有價(jià)金屬回收技術(shù)研究...
- 處理高硫銅精礦大型閃速熔煉爐的...
- PLC高精度行車起重機(jī)多軸伺服...
- 阿特拉斯空壓機(jī)Profibus...
- 國(guó)內(nèi)外銅冶煉行業(yè)大氣污染物排放...
- 尾礦庫大調(diào)洪庫容下的水量平衡計(jì)...
- 某銅礦山污水調(diào)節(jié)庫的設(shè)計(jì)與使用...
- 182 m下承式鋼管混凝土剛架...
- 氣候變化對(duì)南昌地區(qū)建筑能耗的影...
- 老舊燃?xì)饬⒐軉栴}分析及改造管材...